Limited right-of-way, train schedules, and heavy rains -- Fadi Faraj, Vice-President of HVJ North Texas delivered a technical presentation to the Geo-Institute of ASCE detailing the unique challenges of the Trinity River Railway Crossing. In this, Fadi shares how HVJ provided geotechnical design and construction solutions to successfully build the new track on schedule within these constraints.
Want to learn more? This ASCE G-I technical presentation is available here.
TRE’s unique challenges and HVJ’s innovative solutions are also featured in the ASCE Article, Trinity Railway Express Crossing the Trinity River – Design and Construction Challenges, by Fadi N. Faraj PE, Vice President with HVJ Associates® and Robert Lawrence PE, Geotechnical Department Manager with HVJ Associates®
Read the full case study at https://www.hvj.com/trinity-railway-express-crossing-trinity-river.